
The rehabilitation of damaged buildings depends on studying the current condition of the building and conducting preliminary assessments. It links design, materials, and construction methods, and preserves the original structure of the building while taking into account the needs of the occupants.
It includes the implementation and construction of various structures such as residential and commercial buildings and public facilities. The scope of work includes assessing safety and durability and ensuring that work is carried out in accordance with engineering standards and local laws.
The project includes peeling the internal and external tiles, re-tiling the tiles, covering and epoxy insulation works, treating cracks with grout and Sika, then Tyrolean spraying, installing pipes and valves, testing the tank, and building high tanks completely.
The project includes peeling the internal and external tiles, re-tiling the tiles, covering and epoxy insulation works, treating cracks with grout and Sika, then Tyrolean spraying, installing pipes and valves, testing the tank, and building ground tanks completely.
The project includes tile and marble works, kitchen and bathroom fittings, sanitary works, water tank installation, in addition to wood carpentry, aluminum carpentry, iron carpentry, and everything related to interior cladding and water tanks.
The project includes the implementation of water and sewage network projects in Aleppo Governorate as requested.
The project includes extending and expanding water networks with polyethylene pipes of different diameters from (350 mm) to (75 mm).
The project includes extending a 200 mm diameter polyethylene line to a length of 6.5 km.
Rehabilitation of damaged structural works of the Rastan Dam in Hama, in addition to electrical and mechanical works and installation of water pumps.
The project includes extending a 200 mm diameter polyethylene line to a length of 6.5 km.
The project includes the works of cleaning, digging and covering the wells, with a water pumping test for at least 72 hours.
Replacing intermittent electrical panels with medium circuit breakers, vacuum pumps and compressors, in addition to equipping low-voltage panels.
The project includes the restoration of the institute with all related electrical works, painting works, aluminum carpentry works, and some interior cladding works.